What We Do
- All
- Civil/Infrastructure
- Environment
- Landscape
- Utility

NOTL Hydro MTS#2
February 15, 2018
Scope Of Work
Installation of secondary oil containment system
Client
-
Value
-
Challenges
-
Tasks
Demolition of existing containment, excavation and removals for new containment areas and berms, installation of oil containment liner system, installation of sand and fire quenching stone, restoration to disturbed areas

Jaycee Park
November 03, 2017
Scope Of Work
Construction of public park
Client
City of Mississauga
Value
$826,000
Challenges
-
Tasks
Demolition and removals, excavation and grading, drainage improvements, concrete paving, concrete curbs and seat walls, rubber safety surfacing, engineered wood safety surfacing, sand pit, custom play features and equipment, site furniture, planting, sod.

Baif Pond Boardwalk
November 02, 2017
Scope Of Work
Construction of boardwalk in wetland area
Client
Town of Richmond Hill
Value
$240,000
Challenges
environmentally sensitive area, difficult access
Tasks
sediment control, helical piles, concrete abutments, carpentry, restoration

Markham Multi-Use Pathway
November 01, 2017
Scope Of Work
Construction of multi-use trail
Client
City of Markham
Value
$3,000,000
Challenges
Difficult access, traffic and pedestrian control, engineering challenges
Tasks
Excavations and removals, grading, culverts, bank stabilization, armourstone, concrete abutments, helical piles, pedestrian bridges and boardwalks, corten steel signage, asphalt, concrete and granular paving, solar lighting, fencing, furniture, planting, topsoil, seeding and sod

Carruthers Trail
September 13, 2017
Scope Of Work
Construction of multi-use trail
Client
Town Of Ajax
Value
$1,725,000
Challenges
Difficult access, engineering challenges
Tasks
Excavations and removals, grading, culverts, bank stabilization, armourstone, concrete shore wall and abutments, helical piles, pedestrian bridge and boardwalks, steel pergola, fitness stations, asphalt paving, planting, topsoil and sod

Oak Ridges Meadow Park
December 10, 2015
Scope Of Work
Redevelopment of a municipal park
Client
Town of Richmond Hill
Value
$450,000
Challenges
Construction deadline, trade coordination
Tasks
Demolition and removals, erosion and silt control, grading, sub-drains and culverts, limestone pathways, elevated boardwalk with helical piers, concrete curbs and paving, armourstone, granite boulders, engineered wood safety surfacing, play equipment, thematic features, site furniture and signage, planting, topsoil and sod

Corbett Creek Erosion Control
October 10, 2013
Scope Of Work
Erosion restoration and bank stabilization
Client
Town of Whitby
Value
$136,000
Challenges
Environmentally sensitive area, difficult access, steep terrain, sediment control, permits and engineering, traffic and water safety and existing utilities
Tasks
Remove and replace guardrail, excavation of eroded river bank, install stone buttress and rip rap ballast, geo-textile installation, sediment control, sod, terraseed and stabilization planting

Major Wood Cathedraltown Park
January 01, 1970
Scope Of Work
Construction of a municipal park
Client
City of Markham
Value
$1,500,000
Challenges
Construction deadline, trade coordination
Tasks
Large volume earthworks, clearing, grubbing and rough grading, sub-drainage, concrete paving and curbs, stone masonry, asphalt, tennis courts and tennis court fencing, playground and fitness equipment, rubber surfacing, shade structure, electrical lighting, site furnishings, topsoil and finish grading, planting, sodding

East Point Bird Sanctuary
August 21, 2015
Scope Of Work
Construction of Shelters and Bird Blind
Client
T.R.C.A
Value
$600,000
Challenges
Sensitive environment, access, flooding, component integration
Tasks
Fabrication and installation of landscape and architectural elements including shredded bark paths, stabilized aggregate, granular drainage, concrete footings and foundation walls, laser cut weathering steel walls of text and bird shapes, roof structure, railing and posts, custom-fabricated steel floor grating, community bulletin board, faceted armourstone benches, precast concrete benches, seeding and site restoration

Rocking Horse Ranch
August 02, 2015
Scope Of Work
Construction of a municipal park
Client
Town of Richmond Hill
Value
$1,000,000
Challenges
Construction deadline, trade coordination
Tasks
Site preparation, rough and fine grading, storm sewer servicing, subsurface drainage system, asphalt paving, concrete paving and curbs, permeable pavers, double tennis courts, basketball court, playground and exercise equipment, shade structure, fencing, lighting, armourstone, furniture, thematic elements, planting, seeding and sodding

Vanderburgh Parkette
September 17, 2014
Scope Of Work
Construction of a municipal park
Client
Town of Richmond Hill
Value
$370,000
Challenges
Construction deadline, trade coordination.
Tasks
Site preparation and demolition, rough and fine grading, storm sewer servicing, subsurface drainage system, playground equipment, concrete paving and curbs, carpentry, site furniture, pedestrian lighting, planting and sodding.

19th Avenue Bridge Rehabilitation
August 01, 2013
Scope Of Work
Rehabilitation of bridge transition decks and structure
Client
City of Markham
Value
$100,000
Challenges
Road closure, permits, engineering
Tasks
Coordination of road closure and signage, concrete removal, installation and compaction of granular, waterproofing, concrete paving and curbs, asphalt paving guard rail repair and line paiting

East Don River Erosion Control
November 18, 2012
Scope Of Work
Erosion restoration and bank stabilization
Client
City of Markham
Value
$245,000
Challenges
Environmentally sensitive area, difficult access, steep terrain, sediment control, permits and engineering, traffic and water safety
Tasks
Excavation of eroded river bank, install keystones and rip rap ballast, topsoil and stabilization planting

East Humber Trail
October 31, 2012
Scope Of Work
Construction of multi surface recreational trail and boardwalk system
Client
Town of Richmond Hill
Value
$1,700,000
Challenges
Environmentally sensitive area, restricted access, expansive work site, multiple terrain types and water crossings and grand opening deadlines
Tasks
Multi surface trail system, helical piles, observation deck and 4 steel pedestrian bridges, steel framed boardwalks, impressed concrete, asphalt paving, stone seat walls, fencing, site furniture and signage, site drainage, bat boxes and poles, grading, planting, sod and seeding

Block 12 Bridges & Pathways
November 04, 2011
Scope Of Work
Community pathway and installation of pedestrian bridges
Client
City of Vaughan
Value
$365,000
Challenges
Environmentally sensitive area, restricted access and varied terrain
Tasks
3 pedestrian bridges, bridge abutments, coffer dams, asphalt paving, concrete paving, culverts, bollards, clearing and grubbing, grading, terra seeding, planting, topsoil and sod

Jeffrey Park
August 16, 2019
Scope Of Work
Installation of new footbridge, concrete splash pad and water features, new playground and play equipment.
Client
Array
Value
Array
Challenges
Array
Tasks
Construction hoarding, tree protection fencing, siltation control fencing, Demolition and removal of existing playground area, tree clearing and grubbing, Rough grading an engineered fill placement, Site servicing, storm drains, live of Regional water main, new water service, naturalized wetland swale and foot bridge, concrete curbs, sidewalks, walkways, concrete splash pad and water features, new playground and play equipment, engineered playground safety service, asphalt paving and pathways, multi-skills Court, custom multi sport steel goals, weeping tile drainage and field upgrades to two full-size soccer fields, helical piles, cast in place concrete abutments for pedestrian bridge across existing watercourse, elevated Boardwalk on custom structural steel framing, extensive planting seeding and sodding.

Marina Village Beach Club
October 30, 2017
Scope Of Work
Landscaping Works
Client
The Beach Club Inc.
Value
$1,600,000
Challenges
-
Tasks
Landscaping works for new beach club at Friday Harbour. Work consisted of: concrete paving, asphalt paving, interlocking unit pavers, turfstone paving, Kebony wood decking, decorative glass railings and gates, decorative metal fence and gates, segmental retaining wall, shelter in pool area, deck cabanas, planting, excavation and grading for beach area, drains and subdrains, supply & install beach sand and volleyball furnishings, foundations and grading for boardwalk

Ajax Bridge Repair
March 21, 2022
Scope Of Work
Rehabilitation of a pedestrian bridge and watercourse restoration.
Client
Municipality of Ajax
Value
$100,000
Challenges
Watercourse exposure and protection, pedestrian traffic, permits, engineering.
Tasks
Watercourse protection, pedestrian protections, concrete reinforcement, bank stabilization, trail remediation.

Grand Avenue
March 21, 2022
Scope Of Work
Contaminated grounds remediation and construction of a municipal park.
Client
City of Toronto
Value
$6,500,000
Challenges
Traffic and pedestrian control, fill export, various trades coordination, permits, testing, engineering.
Tasks
High volume import and export of fill and soil, grading, sewers expansion, drainage, earthworks, grading, soccer field, dog park, parking lot, splash pad, trails, fencing, lighting, planting and sodding.

Kennedy Bridge Repair
March 21, 2022
Scope Of Work
Rehabilitation of a timber deck, steel beam, asphalt capped road bridge.
Client
Municipality of Ajax
Value
$40,000
Challenges
Work at heights, traffic control, engineering, permits.
Tasks
Demolition/removals down to steel beams, replace timber deck and asphalt surface.

Markham Culverts
March 21, 2022
Scope Of Work
Rehabilitation of 3 existing roadway culverts.
Client
City of Markham
Value
$475,000
Challenges
Watercourse protection, live utilities, traffic control, pedestrians, engineering, permits.
Tasks
Dewatering/water diversion, demolition/removals of deteriorated concrete, excavations, concrete remediation, asphalt paving, grounds remediation.

Aurora Pond
March 21, 2022
Scope Of Work
Rehabilitation of existing storm water management pond and community park.
Client
York Region
Value
$4,200,000
Challenges
Dewatering above an artesian well, traffic control, engineering, permits.
Tasks
Ongoing dewatering, high-volume earthworks and grading, sewers installation, parking lot, trails, planting, hydroseeding, sodding.

Rouge River Erosion Restoration
March 21, 2022
Scope Of Work
Erosion restoration and bank stabilization.
Client
City of Markham
Value
$800,000
Challenges
Dewatering, traffic control, engineering, permits.
Tasks
Ongoing dewatering, high-volume earthworks and grading, sewers installation, parking lot, trails, planting, hydroseeding, sodding.

Friday Harbour EPA Trail
March 21, 2022
Scope Of Work
Construction of a trail system in a dense, mature wood.
Client
Friday Harbour Resort Inc.
Value
$1,200,000
Challenges
Watercourse protection, dewatering, access, permits, engineering.
Tasks
Coffer dam construction, excavation of eroded river bank, install keystones and rip rap ballast, place and compact granular material, stone retaining wall, geo-fabric installation, topsoil, sod and stabilization planting, reinstate septic and irrigation system.

Longyard Subdivision Natural Land Trails
March 21, 2022
Scope Of Work
Construction of a trail system through the conversation lands of a new subdivision.
Client
City of Vaughan
Value
$1,000,000
Challenges
Watercourse protection, pedestrian control, access, permits, engineering.
Tasks
Excavations and removals, grading, culverts, armour stone retaining walls and features, concrete abutments, pedestrian bridges signage, asphalt, concrete and granular paving, planting, topsoil, seeding and sod.

Pope John Paul Secondary School Bank Stabilization
March 21, 2022
Scope Of Work
Rehabilitation of eroded bank and parking lot.
Client
Toronto District Catholic School Board
Value
$680,000
Challenges
Watercourse protection, access/grades, engineering, permits.
Tasks
Clearing, import fill, sewer installation, install of engineered stabilization materials, backfill, grading, planting, seeding, asphalt paving.

Albarrie MS19 Dixie Substation
March 21, 2022
Scope Of Work
Installation of 2 transformer oil containment systems plus detention pit.
Client
Alectra Utilities
Value
$120,000
Challenges
High voltage electrical present, no mechanical excavation permitted.
Tasks
Excavate, export, install containment materials, backfill with fire quenching stone, restore grounds.

Halton Hills MTS #1
March 21, 2022
Scope Of Work
Construction of a new transformer station to support the infrastructure of an existing energy generation plant. Client: Halton Hills Hydro
Client
Halton Hills Hydro
Value
$4,000,000
Challenges
High voltage electrical present, permits, engineering.
Tasks
Civil contractor to the hydro electrical constructor: High-volume earthworks, excavations and concrete works for the installation sewers, control building, blast wall, transformers foundations and containments. Install containment materials, backfill with fire quenching stone. Complete grounds with fencing, asphalt paving, planting, seeding, and sodding.
K-Line TS #3 Firewall Extension
March 21, 2022
Scope Of Work
Extension of an existing blastwall between two transformers.
Client
Alectra Utilities
Value
$220,000
Challenges
High voltage overhead, work at heights, access, schedule.
Tasks
Excavate, expand footing, dowel, form and pour extensions to height and width, backfill.

Rosehill Substation
March 21, 2022
Scope Of Work
Construction of a new transformer.
Client
Canadian Niagara Power Inc,
Value
$600,000
Challenges
High voltage electrical present, permits, engineering.
Tasks
Civil contractor to the hydro electrical constructor: High-volume earthworks, excavations and concrete works for the installation sewers, control building, blast wall, transformers foundations and containments. Install containment materials, backfill with fire quenching stone. Complete grounds with fencing, asphalt paving, planting, seeding, and sodding.

Honey and Barry Community Park
March 21, 2022
Scope Of Work
Construction of a new memorial park.
Client
UJA Federation of Greater Toronto
Value
$400,000
Challenges
High water table, watercourse protection, access and staging through finished, high-end grounds.
Tasks
Stripping, grading, garden beds, screenings trail, fencing, railings, seating features, planting, mulching, sodding, seeding.

Mount Pleasant Cemetery Scattering Garden
March 21, 2022
Scope Of Work
Rehabilitation and extension of an existing trail system.
Client
City of Markham
Value
$145,000
Challenges
Pedestrians and vehicle traffic, being respectful of those who mourn and the memorials of those who have passed.
Tasks
Monument installation on foundation, boulders, pavers, pathways, planting, and sodding.

U of Guelph Childcare Learning
March 21, 2022
Scope Of Work
Award winning, design, build partnership of childcare sensory, outdoor play space.
Client
University of Guelph
Value
$700,000
Challenges
Various subcontractors and material resources, condensed workspace.
Tasks
Demolition and removals, excavation and grading, drainage, concrete and asphalt installations, custom play and learning features, equipment and surfaces, fencing, planting, sodding.
Hidden Valley Crescent Park
March 21, 2022
Scope Of Work
Construction of a natural play area and playground.
Client
City of Kitchener
Value
$200,000
Challenges
Various subcontractors and material resources.
Tasks
Stripping, clearing, excavation and grading, drainage, concrete curbs and walkways, playground equipment, play surfaces, armour stone, planting, sodding.

King’s College Park
March 21, 2022
Scope Of Work
Construction of a multi-feature, large park.
Client
Town of Richmond Hill
Value
$1,100,000
Challenges
Pedestrians, various subcontractors, and material resources.
Tasks
Large volume earthworks, clearing, grubbing and rough grading, drainage, concrete paving and curbs, asphalt, basketball courts, pickle ball courts with fencing, playground, and fitness equipment, play surfaces, shade structures, electrical lighting, site furnishings, topsoil and finish grading, planting, sodding.
Jefferson Salamander Park
March 21, 2022
Scope Of Work
Construction of a themed play and learning area, and playground.
Client
Town of Richmond Hill
Value
$700,000
Challenges
Intricate flat concrete forming and finishing, pedestrians.
Tasks
Site preparation and demolition, rough and fine grading, drainage, playground equipment, concrete paving and curbs, railings, boulders, site furniture, planting, sodding.